The pad, with the borrow pit in the background. The piles of topsoil behind the equipment were later spread back over the borrow pit. The water in the foreground will be rerouted through a culvert. |
Half of the borrow pit, ultimately they would dig down about 10 feet. |
No comments:
Post a Comment